Want to know how to perform Preliminary Hazard Identification with Mil-Std-882E? (This is Task 201 under the standard.) This is the first step in safety assessment. We look at three classic complementary techniques to identify hazards and their pros and cons. This includes all the content from Task 201, and also practical insights from my […]

Want to know how to perform Preliminary Hazard Identification with Mil-Std-882E? (This is Task 201 under the standard.)

This is the first step in safety assessment.  We look at three classic complementary techniques to identify hazards and their pros and cons.  This includes all the content from Task 201, and also practical insights from my 25 years of experience with Mil-Std-882. 

You Will Learn to:

  • Conduct Preliminary Hazard Identification using diverse techniques for best results;

  • Define what Preliminary Hazard Identification is and does;

  • Record Preliminary Hazard Identification results correctly;

  • Contract for Preliminary Hazard Identification successfully; and

  • Apply it early enough to make a difference.

This is the seven-minute-long demo video.

Buy the full lesson here

Topics: Preliminary Hazard Identification with Mil-Std-882E

  • Task 201 Purpose & Task Description;

  • Historical Review;

  • Recording Results;

  • Contracting; and

  • Commentary:

    • Historical Data;

    • Hazard Checklists; and

    • Analysis Techniques.

Transcript: Preliminary Hazard Identification

Hello, everyone, and welcome to the Safety Artisan, where you will find instructional materials that are professional, pragmatic, and impartial because we don’t have anything to sell, and we don’t have an axe to grind. Let’s look at what we’re doing today, which is Preliminary Hazard Identification. We are looking at one of the first actual analysis tasks in Mil-Std-882E, which is a systems safety engineering standard from the US government, and it’s typically used on military systems, but it does turn up elsewhere.

Preliminary Hazard ID is Task 201

I’m recording this on the 2nd of February 2020, however, the Mil-Std has been in existence since May 2012 and it is still current, it looks like it is sticking around for quite a while, and this lesson isn’t likely to go out of date anytime soon.

Topics for this session

What we’re going to cover is, quoting from the task, first of all, we’re going to look at the purpose and the task description, where the task talks quite a lot about historical review (I think we’ve got three slides of that), recording results, putting stuff in contracts and then I’m adding some commentary of my own. I will be commenting all the way through, that’s the value add, that’s why I’m doing this, but then there’s some specific extra information that I think you will find helpful, should you need to implement Task 201. In this session, we’ve moved up one level from awareness and we are now looking at practice, at being equipped to actually perform safety jobs, to do safety tasks.

Preliminary Hazard Identification (T201)

The purpose of Task 201 is to compile a list of potential hazards early in development. two things to note here: it is only a list, it’s very preliminary. I’ll keep coming back to that, this is important. Remember, this is the very first thing we do that’s an analytical task. There are planning tasks in the 100 series, but actually, some of them depend on you doing Task 201 because you can’t work out how are you going to manage something until you’ve got some idea of what you’re dealing with. We’ll come back to that in later lessons.

It is a list of potential hazards that we’re after, and we’re trying to do it early in development. And I really can’t overemphasize how important it is to do these things early in development, because we need to do some work early on in order to set expectations, in order to set budgets, in order to set requirements and to basically get a grip, get some scope on what we think we might be doing for the rest of the program. this is a really important task and it should be done as early as possible, and it’s okay to do it several times. Because it’s an early task it should be quick, it should be fairly cheap. We should be doing it just as soon as we can when we’re at the conceptual stage when we don’t even have a proper set of requirements and then we redo it thereafter maybe. And maybe different organizations will do it for themselves and pass the information on to others. And we’ll talk about that later as well.

Task Description

This is the task description. It says the contractor shall – actually forget about who’s supposed to do it, lots of people could and should be doing this as part of their project management or program management risk reduction because as I said, this is fundamental to what we’re doing for the rest of the safety program and indeed maybe the whole project itself. So, what we need to do is “examine the system shortly after the material solution analysis begins and compile a Preliminary Hazard List (PHL) identifying potential hazards inherent in the concept”. That’s what the standard actually says.

A couple of things to note here. Saying that you start doing it after material solution analysis has begun might be read as implying you don’t do it until after you finish doing the requirements, and I think that’s wrong, I think that’s far too late. To my mind, that is not the correct interpretation. Indeed, if we look at the last four words in the definition, it says we’re “identifying potential hazards inherent in the concept”. That, I think, gives us the correct steer. we’ve got a concept, maybe not even a full set of requirements, what are the hazards associated with that concept, with that scope? And I think that’s a good way to look at it.

Historical Review

This task places a great deal of emphasis on the review of historical documentation, and specifically on reviewing documentation with similar and legacy systems. an old system, a legacy system that we are maybe replacing with this system but there might be other legacy systems around. We need to look at those systems. The assumption is that we actually have some data from similar and legacy systems. And that’s a key weakness really with this, is that we’re assuming that we can get hold of that data. But I’ll talk about the issues with that when I get to my commentary at the end.

We need to look at the following…

End: Preliminary Hazard Identification with Mil-Std-882E

You can find a free pdf of the System Safety Engineering Standard, Mil-Std-882E, here.

Meet the Author

Learn safety engineering with me, an industry professional with 25 years of experience, I have:

•Worked on aircraft, ships, submarines, ATMS, trains, and software;

•Tiny programs to some of the biggest (Eurofighter, Future Submarine);

•In the UK and Australia, on US and European programs;

•Taught safety to hundreds of people in the classroom, and thousands online;

•Presented on safety topics at several international conferences.

Simon Di Nucci
Simon Di Nucci

Simon Di Nucci, CPEng, FIEAust, NER, brings 30 years of experience in safety engineering and consultancy. His work spans aircraft, ships, submarines, air-traffic management systems, trains and software in the UK and Australia.

About the author

Keep exploring.

All resources
blog

Risk Assessment Standards: How to Choose and Use Them

Risk Assessment Standards: How to Choose and Use Them. The standard is the thing that we’re going to use to achieve things – the tool. And that’s important because tools designed to do certain things usually perform well. But they don’t always perform well on other things. So we will ask, ‘Are we doing the […]

Read article
mil std 882e

System Safety Analysis: Methods, Tasks and Techniques

In this ‘super post’, we will learn System Safety Analysis: Methods, Tasks and Techniques. I will show you thirteen lessons that explain each of the ten analysis tasks, the analysis process, and how to combine those tasks into a program! Follow the links to sample and buy lessons on individual tasks. Introduction Military Standard 882, […]

Read article
mil std 882e

Sub-System Hazard Analysis with Mil-Std-882E

In this video lesson, I look at Sub-System Hazard Analysis with Mil-Std-882E (SSHA, which is Task 204). I teach the mechanics of the task, but not just that. I’m using my long experience with this Standard to teach a pragmatic approach to getting the work done. Task 204 is one of three tasks that integrate […]

Read article

THE SAFETY ARTISAN NEWSLETTER

Keep learning.
Stay curious.

Practical safety ideas and training updates from Simon, delivered to your inbox.

You can unsubscribe at any time. If the form does not load, open it directly.